Oak Grove Trustees
Meet Our Team
![image.png](https://static.wixstatic.com/media/e2626c_183708f873314184af2000ca2cc37490~mv2.png/v1/fill/w_593,h_198,al_c,q_85,enc_avif,quality_auto/e2626c_183708f873314184af2000ca2cc37490~mv2.png)
August 15, 2024
Oak Grove UMC received monetary compensation for an upcoming Battlefield-Great Bridge Blvd construction project. The Finance Committee wisely invested that money. As a result, we've been able to complete several necessary building upgrades.
We've been able to replace all FIVE (5) HVAC units in the Children's Wing building, at a cost of $60,000! The pictures show how difficult the project was.
The second building upgrade consisted of improving the crawlspace under the Historic Sanctuary. The cost of this project was $25,000.
Completed items were:
•Laying 14mil plastic vapor barrier under entire building
•Sealing exterior vents
•Installing 2 dehumidifiers
•Installing a new sump pump that discharges water into the north drainage area
•Installing a heat/humidity monitoring station for both exterior and under sanctuary conditions
Plus, we upgraded our lawn mower which we use to do our own landscaping!
Thanks be to God!
-Oak Grove UMC Trustees Committee
![image.png](https://static.wixstatic.com/media/e2626c_c6b5cc2c0fd249bb935f4596554c3077~mv2.png/v1/fill/w_600,h_503,al_c,q_85,enc_avif,quality_auto/e2626c_c6b5cc2c0fd249bb935f4596554c3077~mv2.png)
![pic1.png](https://static.wixstatic.com/media/e2626c_33bd26942ccf4bb6bc73cbef5f90660b~mv2.png/v1/fill/w_404,h_338,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/e2626c_33bd26942ccf4bb6bc73cbef5f90660b~mv2.png)
![pic2.png](https://static.wixstatic.com/media/e2626c_8826c46888194ba68691091ac62e6fe0~mv2.png/v1/fill/w_404,h_338,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/e2626c_8826c46888194ba68691091ac62e6fe0~mv2.png)